SBEM stands for Simplified Building Energy Model. SBEM calculations are the UK government’s official method for assessing the energy performance of non-domestic buildings – essentially the commercial or industrial equivalent of the SAP calculation used for new dwellings. An SBEM calculation estimates a building’s annual energy use and CO₂ emissions based on its design (walls, floors, roof, glazing, heating/cooling systems, lighting, etc.). This ensures the design meets minimum efficiency standards under Part L of the Building Regulations. In practice, architects or engineers submit SBEM data to show the building will use no more energy (in carbon terms) than the regulations allow.
An SBEM calculation evaluates a building’s energy use and carbon dioxide emissions over a 12-month period, providing a clear picture of energy efficiency for non-domestic buildings including offices, warehouses, retail units, restaurants, leisure centres, and industrial facilities. The method uses different sets of default information depending on the building’s specific use – recognising that a community hall will not have the same energy patterns as a restaurant or warehouse.

Legal Requirements and Applications
An SBEM calculation is legally required for new non-residential buildings in England and Wales, and for certain major commercial projects. The system is mandated under Part L (England & Wales), Section 6 (Scotland), and Part F1 (Northern Ireland) of the Building Regulations, all concerned with the conservation of fuel and power. Originally based on Dutch energy performance guides, SBEM calculations became part of UK Building Regulations in 2006.
The certified SBEM model produces a compliance report (a BRUKL report) that compares the building’s Building Emission Rate (BER) to the Target Emission Rate (TER). The building passes Part L if BER ≤ TER. Once construction is finished, SBEM is run again (as-built) and the same model generates a commercial Energy Performance Certificate (EPC). In short, SBEM (via the BRUKL report) demonstrates compliance with Part L, and its output automatically yields the required non-domestic EPC.
Key SBEM Compliance Outputs
BRUKL Compliance Report: Shows the calculated BER vs the TER (emission target). Compliance is achieved when BER ≤ TER. The BRUKL report is a detailed compliance document that provides a comprehensive overview of the building’s predicted carbon emissions, energy consumption, and compliance with Part L targets. It also details solar gain management strategies, minimum standards for the building fabric, and efficiency of installed systems. This report is required for building control approval and is key to generating the final commercial EPC.
Commercial EPC: An A–G rating (and carbon emissions target) for the building, produced from the SBEM model. The EPC rates the property between 1 and 100 – the closer to 100, the more energy efficient the building. This EPC is legally required when selling or renting non-domestic properties, and it is against the law to rent or sell a commercial property without a valid EPC.
Who Can Perform SBEM Calculations?
The SBEM process must be carried out by an accredited energy assessor – specifically a qualified Commercial Energy Assessor (Level 4 or 5) using government-approved software. Engaging the assessor early (at the design stage) is strongly advised – in fact, Building Control will not permit construction to start without a design-stage SBEM report in hand.
SBEM calculations are performed using government-approved software such as iSBEM, which follows the official methodology for energy modelling. Advanced tools like DesignBuilder, IES, and TAS also use the underlying SBEM methodology but offer additional Dynamic Simulation Modelling (DSM) analysis capabilities. These sophisticated tools allow full 3D modelling for more accurate assessments, providing greater design flexibility and the ability to address issues like overheating while optimising factors like daylighting levels and occupant comfort.
When Are SBEM Calculations Required?
SBEM calculations are mandatory for most new or significantly altered commercial projects. Key triggers include:
New non-domestic buildings: Any newly constructed commercial, industrial, educational or public building (e.g., offices, shops, schools, hospitals, factories) over 50m² must have an SBEM assessment to demonstrate Part L2A compliance.
Large extensions: An extension is treated as a “new building” if it is both over 100m² and more than 25% of the original building’s floor area. Such extensions require an SBEM calculation and must meet Part L standards. (Smaller extensions may only require simpler SAP or SAP-derivative checks.)
Major refurbishments or change-of-use: If you add or replace major systems (heating, cooling, ventilation) in an existing building, or change its use (e.g., converting a warehouse to a cinema, or a former industrial unit to offices), you will typically need an SBEM calculation under Part L2B. This “material change of use” ensures the refurbished building still meets current efficiency rules.
Commercial EPC requirement: Whenever a non-domestic building is built, sold, or rented, UK law requires a valid commercial EPC. SBEM calculations form the basis of that EPC. In practice, any project needing an EPC (e.g., new build or major sale) will need an SBEM calculation.
Shared heated areas: Corridors, shared lounges, staff rooms, and other communal spaces that are heated will also require SBEM calculations as part of the overall building assessment.
Exemptions and Special Cases
Certain buildings may be exempt from SBEM requirements:
- Buildings under 50m² floor area (though some small commercial spaces may still require assessment)
- Places of worship
- Temporary buildings (less than 2 years)
- Unheated buildings
However, exemptions can be complex. Always confirm with your local Building Control to understand specific exemptions or additional requirements for your project.
The Four Key SBEM Criteria
SBEM calculations in England measure four essential criteria:
- Carbon Emissions Compliance: Ensuring the Building Emission Rate (BER) does not exceed the Target Emission Rate (TER)
- Building Systems Efficiency: Assessing building fabric and HVAC systems (heating, cooling, ventilation), hot water, and fixed lighting systems to achieve reasonable overall energy efficiency standards
- Solar Gain Management: Demonstrating appropriate passive control measures to limit solar gains during summer months, reducing air conditioning demand
- Energy Efficient Operation: Ensuring necessary provisions for energy efficient building operation are in place, including building management systems where appropriate
What Does an SBEM Calculation Cover?
SBEM calculations assess several key factors to ensure energy efficiency compliance:
- Building fabric: Including U-values of walls, floors, roofs, and windows
- HVAC system efficiency: Heating, ventilation, and air conditioning systems
- Lighting and controls: Fixed lighting systems, lighting controls, and daylighting measures
- Solar gains and passive cooling: Strategies to limit summer overheating and reduce air conditioning demand
- Renewable energy technologies: Any installed renewable systems
- Energy efficient operation provisions: Building management systems and operational controls
- Construction details: Specific construction types and thermal bridging assessments
Building Zoning and Usage Patterns
SBEM divides buildings into multiple zones based on different usage patterns and occupancy levels, allowing calculations to reflect the varied energy demands of offices, retail spaces, storage areas, and public zones. This detailed zoning approach differs from SAP calculations by assigning specific use patterns not only to the building as a whole but to various zones within it, each with different assumptions about building services use and occupancy patterns. This zoning system improves the accuracy of energy performance predictions and ensures tailored energy calculations per zone.

The SBEM Process: Design Stage and As-Built
SBEM calculations come in two formats:
L2A SBEM for new commercial builds (includes design-stage and as-built reports) L2B SBEM for extensions, conversions, and refurbishments (includes notional and proposed reports)
Design Stage Assessment
Before construction begins, the SBEM assessor uses detailed plans and specifications to create an energy model predicting the building’s emissions and energy use. This design-stage report is submitted for building control approval to demonstrate that the project meets Part L requirements. The assessment should be carried out before building work starts to ensure confidence that plans will achieve compliance.
As-Built Assessment
After construction completes, the assessor updates the model with actual installed materials and systems, generating the final report and commercial EPC. This confirms the building performs as designed and verifies that the completed building meets the design stage energy performance standards.
Information Required for SBEM Calculations
To ensure accurate SBEM calculations, provide your assessor with comprehensive project information including:
- Detailed floor plans and elevations
- Building sections and site plans
- Insulation specifications (type and thickness)
- U-values of all openings (windows, doors, rooflights)
- Complete heating system specifications
- Hot water generation details
- Lighting controls and lighting specifications
- Ventilation and cooling system specifications
- Renewable technology details
- Thermal bridging scheme and thermal bridging information
The more detailed information provided, the more accurate the assessment and the smoother the approval process.
Timeline and Project Planning
SBEM assessments typically take between 5 and 10 working days, depending on the size and complexity of the project. A large warehouse development will require significantly more time than a single retail unit. Engaging your assessor early can help ensure sufficient time for revisions, especially if initial results show non-compliance.
What Happens If Your Building Fails?
If SBEM calculations show non-compliance, it’s crucial to address issues before construction begins. Early assessment allows your energy consultant to provide advice on improvements while design changes are still cost-effective and feasible. Later in the project, the scope of available changes becomes more limited and expensive to implement.
Many assessment providers offer consultancy services beyond basic calculations, providing comprehensive support and guidance throughout the entire SBEM process to help ensure compliance.
Beyond Basic Compliance: Meeting Higher Standards
While SBEM focuses on Part L compliance, local planning authorities may require standards beyond minimum regulatory requirements. In London, for example, the Greater London Authority (GLA) may require a 35% improvement beyond Part L for major developments. SBEM can be integral to meeting these enhanced standards and supporting additional sustainability certifications like BREEAM.
SBEM calculations also serve as valuable tools for identifying opportunities to improve a building’s energy efficiency, reduce operating costs, and support broader sustainability goals. By modelling energy use and pinpointing inefficiencies early in the design process, SBEM can guide better design decisions and integration of renewable technologies.
Why Engage Early with an SBEM Assessor?
Early engagement with a qualified assessor ensures:
- Risk identification: Compliance risks are identified before construction starts
- Design optimisation: Opportunities to explore energy-efficient design changes and cost savings
- Avoid delays: Prevents costly retrofit fixes or delays at building control stage
- Smooth completion: Ensures straightforward EPC generation upon completion
- Regulatory confidence: Provides assurance that the design will meet current and emerging standards
The Role of SBEM in Sustainable Construction
SBEM calculations extend beyond regulatory compliance – they drive the creation of buildings that are both environmentally responsible and economically beneficial. As the construction industry works toward net zero by 2050, SBEM calculations help ensure that commercial buildings contribute positively to the green agenda through well-designed, energy-efficient heating, cooling, ventilation, and lighting systems.
By establishing energy performance early in the design process and providing clear metrics for improvement, SBEM calculations support the development of buildings that are not only compliant but genuinely sustainable and cost-effective to operate.
Summary
SBEM calculations are essential for proving that commercial and non-domestic buildings in England and Wales comply with Building Regulations Part L. They assess a building’s energy efficiency by modelling heat loss, energy use of services, and emissions to ensure environmental standards are met. Required for new builds over 50m², large extensions, major refurbishments, and when a commercial EPC is needed, SBEM calculations support sustainable construction and regulatory compliance. Early collaboration with an accredited Level 4 or 5 Commercial Energy Assessor smooths the design and approval process, saving time and money while ensuring optimal building performance.